Published date: 16 September 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Miscellaneous cordage, rope, twine and netting - 39540000
Cordage, rope, twine and netting - 39541000
Metal netting - 44313000
London
£150,000 to £250,000
C4N85234268
16 September 2024
20 September 2024
12pm
30 August 2025
31 August 2028
Works
No
No
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various roofing and external envelope systems to satellite buildings around the station complex. Those buildings include the following:
• South Portal
• North Portal
• Cycle Hub
• East Core
• West Core
• East & West Vents
Part of the scope of works includes the design, manufacture, supply and installation of bird deterrent netting to the external areas of the buildings which comprise of the following listed below
• Stainless steel grade 316 (grade 1.4401) netting
• The system shall include all fixings, straps, clips, springs and any other accessories required to install the netting to the primary or secondary structure to the required specification.
• Must meet the requirements for durability set out within the specification.
• Works include also mock ups, samples and quality benchmarks.
The Works shall effectively and reliably keep the façade and roof areas free from:
• Bird habitation
• Bird perching
• Bird fouling
The Works shall comply fully with the requirements of:
• The Department for Environment, Food and Rural Affairs (Defra).
• The Royal Society for the Prevention of Cruelty to Animals (RSPCA).
• The Royal Society for the Protection of Birds (RSPB).
• The Wildlife and Countryside Act 1981.
The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing (if req'd), manufacture and installation of bird deterrent systems
The Subsubcontractor will be responsible for progressing the schedule and associated Stage 4 drawings through design for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.
The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the finished systems were required.
Roof covering 1600+ sqm.
Expected Subsubcontract award Jan 25
Construction is to be carried out over a 2.5 year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.
Links
Follow the instructions given in the description or the more information section.
Clare Llewellyn
McDermott House, South Crescent
London
E164TL
UK
07933529243
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Todmorden Library RAAC Roof Replacement Works下一篇:
ซื้อน้ำดื่มจำนวน 1,200 แพ็ค สำหรับห้องพักรายวัน อาคารเรือนวิรัชมิตร (CU iHouse)猜你喜欢