所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 27 February 2024
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
River regulation and flood control works - 45246000
United Kingdom
LBROM001-DN712891-24141938
27 February 2024
27 May 2024
No
No
The lakes at Kelsey Park in Beckenham, Bromley, Greater London, BR3 3LH. Kelsey Park features two lakes (Upper and Lower Lake) which were formed by damming The Beck, an Environment Agency main river, within Kelsey Park. There is a silt trap upstream of the Upper Lake. The lakes fall within the Ravensbourne Catchment.
The appointed contractor is to remove all sediment deposits identified.
Follow the instructions given in the description or the more information section.
procurement
Bromley Civic Centre
Stockwell Close
Bromley
BR1 3UH
United Kingdom
+44 2083134433
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Revitalising North Somerset Peatlands - Topographical Surveys下一篇:
BHCC JB Hard Surface Weed Management 2024猜你喜欢