所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 21 May 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Overhaul and refurbishment work - 45453000
London
£4,949,145
tender_432549/1357780
21 May 2024
20 June 2024
12pm
1 August 2024
3 February 2025
Works
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
No
No
Bastion House is 15-storey office block located in the Barbican area of the City of London, with basement car parking/loading bay and is re-purposed to provide temporary decant space for City of London Corporation. Building was designed by Powell and Moya, it was completed in 1976. The Works will comprise of the soft strip out floors 3 to 10 and fit-out floors 11 to 15, podium and mezzanine floors and lift repair/refurbishment of Bastion House.
Links
Additional text
This tendering exercise is being undertaken using the electronic tendering system
'capitalEsourcing' (www.capitalesourcing.com). Suppliers will need to register an interest on the system in order to participate and registration is free.
The estimated value given is for the full duration of the contract including the maximum possible extensions. The annual value for the purposes of economic and financial standing is therefore 4949145 GBP
Follow the instructions given in the description or the more information section.
James Carter
Guildhall
LONDON
EC2P 2EJ
England
07542226265
james.carter@cityoflondon.gov.uk
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Autonomous Waste Sorting and Segregation (Auto-SAS) - PIN下一篇:
E2414 Warden Hill Jr Electrical Rewiring/Refurbish猜你喜欢