信息详情

Traction Power Earthing Upgrades - Phase 1 Works

2024-10-08

中文

英语 (English)

所属地区: --

所属机构: --

抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 8 October 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 3 December 2024, 12pm

Contract summary

Industry

  • Construction work - 45000000

  • Location of contract

    England

    Value of contract

    £750,000

    Procurement reference

    GMPTE001-DN745191-31733824

    Published date

    8 October 2024

    Closing date

    3 December 2024

    Closing time

    12pm

    Contract start date

    3 February 2025

    Contract end date

    29 August 2025

    Contract type

    Works

    Procedure type

    Open procedure (above threshold)

    What is an open procedure (above threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements above the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    TfGM is looking to establish a contract to ascertain current asset condition information & outline design (Phase 1).

    The current traction return system in the City Centre is already a floating system following the opening of 2nd City Crossing (2CC) in 2017. When the negative return system is floating, protective measures must be in place to protect persons against the risk of electric shock from dangerous voltages (touch or accessible voltages) between the rails and metallic objects or earth within the Overhead Contact Line Zone (OCLZ). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was "floated" in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.

    PIN 2023/S 000-034915


    How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Francesca Hibbert

    Address

    2 Piccadilly Place
    Manchester
    M1 3BG
    England

    Telephone

    +44 1612441599

    Email

    francesca.hibbert@tfgm.com

    Website

    http://www.tfgm.com


    Share this notice

    Is there anything wrong with this page?

    温馨提示:

    本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
           如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    首页 > 英国 > Traction Power Earthing Upgrades - Phase 1 Works