Published date: 5 March 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
WR9 8DS
£85,000 to £100,000
Heritage Centre - Building Works
5 March 2025
25 April 2025
12pm
1 July 2025
31 December 2025
Works
Competitive procedure with negotiation (above threshold)
Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
The Town Council has secured bid funding from the District Council ( Community Legacy) to include with Capital investment to refurbish and improve the Heritage Centre aspect of St Richards House in Droitwich Spa. Procurement has been completed for the internal design and fitments part of the project which is currently now instructed through Contract and in course, In addition through a commissioned Architect we have in place professional surveyors drawings, supporting scale , provisional building works costings for the alterations and planning permission is already granted ( Oct 2024). The scope of the building works is minor internal alterations and panelling in (aluminium and glazing) of an existing front porch structure - conducive to creating additional internal space. The works will include alterations , materials supply and fitment, There will be an element of collaboration required working with the Council , Architect and Design Teams for some component aspects - for example cross over responsibilities including fire and alarm systems & lighting for full integration. From the Project plan we envisage building work to take approximately 6 weeks for completion , which is provisionally anticipated to be from July to September 2025. This will then enable the Design Team a similar timeframe for their installations . Project final end date is expected to be New Year 2026, which therefore aligns both the Building and Design separate contract end dates to be marked as 31.12.2024. This also allows for any contingency planning , slippage on delivery and final snagging before full sign offs. The Town Council has a delegation for Procurement evaluation and maintains full transparency for public sector contracts. Bids are invited in paper written format only to the Town Council correspondence address ( Town Clerks Office). Following closure of the opportunity bids received will be considered and scored simultaneously using a public sector evaluation criteria ( CALC recommended) by the Delegation . The recommended bid will then require ratification by the Full Council for award of Contract. Details of the scoring criteria can be provided on request for interested parties and potential bidders.
Attachments
Follow the instructions given in the description or the more information section.
Mark Keld
St Richards House, Victoria Square
Worcestershire
WR98DS
England
01905 774258
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
จ้างทำความสะอาดอาคารฝั่งตะวันออก 2 จำนวน 1 งาน下一篇:
RA349421 - (New) Lenovo, i5 14th Gen, 16Gb RAM, 512Gb SSD, 15.6 Screen, USB-C Display and Power猜你喜欢