所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 25 November 2024
Last edited date: 25 November 2024
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
Safety barriers - 34928300
HR9 5JA
CRML0001 - Expression of interest - Herefordshire Wilton Rock Face
25 November 2024
29 November 2024
Yes
No
Herefordshire Council require a subcontractor who can provide a proposed permanent barrier solution with a rock trap running along the length of the rock face, at Wilton Rock Face, Wilton Road, Ross on Wye.
Background
Rockfall occurred on Wilton Road in 2019. The road was closed and temporary barriers installed to allow the road to be reopened. There have been a few rock falls since the catchment barriers were installed.
The rock face is within an AONB and is a feature of Ross on Wye.
There are a number of properties above the rockface, including a churchyard.
Proposed solution: A permanent barrier solution with a rock trap running along the length of the rock face.
If you would like to express your interest in this package of works, please email Elisabeth Wyllie at:
elisabeth.wyllie@balfourbeatty.com
Follow the instructions given in the description or the more information section.
Elisabeth Wyllie
5 Churchill Place
LONDON
RG238BG
England
07922 100358
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢