Published date: 11 December 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Steam, hot water and associated products - 09320000
Radioactive materials - 09343000
Primary water systems - 31161400
Instruments for measuring quantities - 38340000
Instruments for measuring flow, level and pressure of liquids and gases - 38420000
Measuring and control equipment - 38424000
Regulating and controlling instruments and apparatus - 38570000
Humidity and moisture measuring instruments - 38930000
Pumps and compressors - 42120000
Pumps for liquids - 42122100
Valves defined by function - 42131100
Pressure-reducing, control, check or safety valves - 42131140
Fabrication work - 45255400
Metalworking - 45262670
Welding - 45262680
Building installation work - 45300000
Installation services of electrical and mechanical equipment - 51100000
Installation services of electrical equipment - 51110000
Installation services of mechanical equipment - 51120000
Installation services of tanks - 51810000
Installation services of reservoirs - 51820000
Project and design preparation, estimation of costs - 71242000
Engineering design services - 71320000
Plant engineering design services - 71323200
Engineering studies - 71335000
Engineering-related scientific and technical services - 71350000
OX14 3DB
£3,700,000 to £4,200,000
20241211173844-72814
11 December 2024
10 January 2025
12pm
7 July 2025
6 July 2028
Supply contract
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Yes
No
The Supply of a WDS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA's Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. The scope of the Assemblies includes final process, mechanical and EC&I design, procurement, fabrication, assembly, Factory Acceptance Testing, delivery, and installation at the Culham site, plus Site Acceptance Testing and Integrated Testing. Design - A process design has been produced for the Water Detritiation System and the proposed equipment has been separated into 10 Assemblies as manageable deliverables. The 10 Assemblies consist of process equipment mostly installed within gloveboxes, and one air extracted cabinet. Manufacturing, FAT, Delivery, Installation, SAT, Integrated Testing & Commissioning - The 10 Assemblies require manufacture, assembly within containments and installation. This includes (but not limited to): installation of the equipment; agreeing and identifying tie-points for process service and electrical distribution interfaces; agreeing and identifying other process interfaces. The Contractor must undertake Factory Acceptance Testing. The commissioning of the fully integrated subsystems shall be carried out by the UKAEA Operations team with support from the Systems Integrator and The Contractor. During inactive commissioning all operations will be tested, and the plant performance assessed under a wide range of expected operating conditions. The Contractor shall provide, People Rates for assisting with commissioning.
Links
Follow the instructions given in the description or the more information section.
Nicola Adams
Culham Campus
Abingdon
OX14 3DB
ENG
+44 1235465379
www.gov.uk/government/organisations/uk-atomic-energy-authority
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Hillingdon Council is seeking a provider of carer support services in its capacity as the lead statutory organisation for the development and delivery of a joint carers strategy. Hillingdon Council invites carer support providers to tender for the opportunity. The purpose of this Service is to provide support to all carers in Hillingdon. A wide range of support can contribute to preventing, reducing, or delaying the needs of carers from developing, thereby enabling them to continue in their caring role for longer. The Council requires the provision of a holistic model to enable carers to access information, advice and support. The Service Provider will develo下一篇:
Tender for Provision of Proactive Monitoring and Take Down Service猜你喜欢