所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 20 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Engineering works and construction works - 45220000
Structures construction work - 45223000
Reinforced-concrete structures - 45223500
Pier construction work - 45241300
Sea wall construction work - 45243300
Concrete repair work - 45262330
South West
£8,000,000 to £8,750,000
BOURN001-DN755872-14630995
20 January 2025
28 February 2025
2pm
1 May 2025
31 December 2026
Works
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages.
Due to budget constraints, the Council are considering 3 options, these being: -
• Option A: All Concrete Works Only
Concrete works only. No removal of any of the timber landing stages.
• Option B: All Concrete Works and Part Timber Landing Stage Removal
Concrete works and the complete removal of the Northern and Small Boat timber landing stages only.
• Option C: All Concrete Works and All Timber Landing Stage Removal
Concrete works and complete removal of all of the timber landing stages
All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works).
The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn't affordable then Option A.
Suppliers can bid to any or all of the 3 options.
The specifications which outline the requirements for this contract are contained with the following document 'Bournemouth Pier Structural Works - Document Schedule 16.01.2025'
The successful Bidder will be expected to commence the works in May 2025 and will be required to ensure the works are completed by December 2026 (not including defects period).
Links
Additional text
Suppliers interested in this opportunity can access the full procurement documentation by visiting BCP Council's Tendering system www.supplyingthesouthwest.org.uk
Suppliers should search for the opportunity through Supplying the South West. There are further details of the opportunity on the advert published on www.supplyingthesouthwest.org.uk and instructions on how suppliers can access the procurement documentation for completion.
Responses to the opportunity must be submitted electronically through www.supplyingthesouthwest.org.uk before the deadline shown on the system.
If you are unable to access the advert for the opportunity through www.supplyingthesouthwest.org.uk please contact the Council using the contact details provided.
Follow the instructions given in the description or the more information section.
Strategic Procurement Team
BCP Council
Civic Centre, Bourne Avenue
Bournemouth
BH2 6DY
England
+44 1202128989
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢