所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 17 December 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Other community, social and personal services - 98000000
WR9 7PU
£50,000 to £103,855
WychPIP
17 December 2024
24 January 2025
4pm
24 February 2025
31 October 2025
Works
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
Yes
Dodderhill Parish Council is issuing this Request for Formal Quotations for the competitive procurement of six pieces of work (5 separate phases) to be carried out at Wychbold Playing Fields, School Road, Wychbold WR9 7PU.
Site visits are mandatory to tender for this work and requests for site visits or any questions can be addressed to the Wychbold PIP (Park Improvement Plan) Coordinator:
Parkplan@dodderhill-pc.gov.uk or tel: 07821 641382
or to the Parish Council Clerk: Clerk@dodderhill-pc.gov.uk - tel: 01527 372548.
Paths - Phase 1a
Aims
• To improve access and accessibility for all abilities to the allotments, orchard and football fields by widening and extending existing paths.
• To use suitable pathway materials that will have minimal impact on the surroundings, match existing paths including those in the sensory garden; paths will include sufficient turning circles for inclusivity and relevant signage.
• To include permanent distance markers on path surfaces to encourage exercise.
Car Park - Phase 1b
Aims
• Separating pedestrian and vehicle routes where feasible.
• To mark out parking spaces for disabled users and for electric charging use.
• To add electric charging point for vehicles.
• To replace current tarmac area with an eco-friendly surface that includes space for plants yet provides hard standing for cars
• To remove and appropriately dispose of via a licensed waste carrier, the existing car park barrier.
• Supply and install a replacement car park barrier with height restrictions to prevent the entrance of larger/ higher vehicles at the entrance to the car park which can be opened if/ when larger vehicles are needed to carry out works in the park area.
• To replace outside lights with nocturnal animal-friendly ones.
• Review of car park to provide further suggested improvements.
Community Sensory Garden - Phase 2
Aims- Reduce and Tidy
This is to be a beautiful and peaceful place to sit, rest and reflect and contemplate. It will also be used as a community meeting place, a site for workshops, remembrance services, carol singing and other community activities. It needs to be accessible to all and include seating and shelter.
Wildlife Corridors - Phase 3
Information
A number of hedges run alongside the orchard, allotments, playing fields area, car park and proposed sensory garden. These have been in situ for many years and some like the one to the side of the orchard are protected. A number of areas have been damaged or destroyed and a gate, no longer used, makes a big break in the hedge alongside Stoke Road.
Orchard - Phase 4
Aims - To enhance the existing orchard so that it becomes a functioning community orchard.
Community Allotment Plot - Phase 5
Aims
• To improve access by widening existing paths and creating new paths
• To improve the community plot.
Attachments
Follow the instructions given in the description or the more information section.
Gill Lungley
Dodderhill Parish Council, Wychbold Village Hall
Droitwich
WR97PU
England
01527372548
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
เรื่องประกาศราคากลางการจัดจ้างบำรุงรักษาระบบแอปพลิเคชั่นรูปแบบเว็บและมือถือสำหรับลูกค้า(TrackingServices)โดยวิธีเฉพาะเจาะจงเพื่อการพาณิชย์下一篇:
PL0317 Urban Tree Challenge Fund - Highway Tree Planting猜你喜欢