所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 1 August 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Marine construction works - 45244000
Construction work for hydro-mechanical structures - 45248000
South East
£600,000 to £1,000,000
20240801170748-153032
1 August 2024
22 August 2024
12pm
1 November 2024
15 October 2025
Not specified
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Yes
No
This project relates to the High Pressure Salt Water (HPSW) fire suppression system at 14 and 15 dock. A new HPSW system is required for vessels in wet dock and dry dock for fire suppression while maintenance work is ongoing. The initial phase of this project is survey & design, the contract may extend to build however this will be determined once the solution is established. Please note the information in this notice relates to whole project if build is included.
The aim of the initial phase is to survey and determine all the unknown variables and to produce a detailed design of a permanent solution for vessel fire suppression. Scope of the works may also include removal of any existing redundant systems required to install the new system, ground and engineering works required enable the system to be used as intended.
Links
Follow the instructions given in the description or the more information section.
Chris May
Victory Building, Room 233, The Parade, HM Naval Base
Portsmouth
PO1 3LS
ENG
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Retail Coffee Offering - WFG下一篇:
Provision of service for the Digitisation of historic census statistical publications猜你喜欢