所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 24 June 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Electrical installation work - 45310000
Electrical wiring and fitting work - 45311000
Electrical wiring work - 45311100
Electrical fitting work - 45311200
Electrical installation work of heating and other electrical building-equipment - 45315000
Electrical engineering installation works - 45315100
Other electrical installation work - 45317000
Electrical installation work of transformers - 45317200
Electrical installation work of electrical distribution apparatus - 45317300
Electrical installation work of filtration equipment - 45317400
Mechanical installations - 45350000
Mechanical engineering installation works - 45351000
Electrical-system repair services - 50116100
Repair and maintenance services of electrical machinery, apparatus and associated equipment - 50532000
Repair and maintenance services of electrical and mechanical building installations - 50710000
Repair and maintenance services of electrical building installations - 50711000
Repair and maintenance services of mechanical building installations - 50712000
Installation services of electrical and mechanical equipment - 51100000
Installation services of electrical equipment - 51110000
Installation services of mechanical equipment - 51120000
Electrical services - 71314100
Engineering design services for mechanical and electrical installations for buildings - 71321000
Electrical power systems design services - 71323100
Mechanical engineering services - 71333000
Mechanical and electrical engineering services - 71334000
West Midlands, East Midlands, South East
£250,000 to £500,000
C4N81727798
24 June 2024
5 July 2024
7pm
25 October 2024
28 March 2025
Works
No
No
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent contractor to provide the electrical heating system.
Scope includes: heating requirements for rooms, air tempering for the ventilation system, and freeze protection for exposed water pipes. The Rooms heating system is designed to maintain room temperatures to provide frost protection and reduce condensation risks. During winter conditions, the system will temper outside air to avoid condensation within the equipment and rooms, meeting the required supply air flow design temperature conditions. Water pipes exposed to ambient temperatures or buried shallow underground (less than one meter) will be heat traced to prevent freezing.
Links
Follow the instructions given in the description or the more information section.
Chris Read
Floor 5, 19 Cornwall Street
Birmingham
B3 2DT
UK
07792825436
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
EKFB JV - Mechanical Electrical Works for Green Tunnel Portal Building Mechanical Cooling System Package下一篇:
LDC-417 Burntwood Development Masterplan猜你喜欢