所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 13 November 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction equipment - 43320000
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
Any region
£100,000 to £150,000
C4N87443335
13 November 2024
21 November 2024
6pm
1 April 2025
31 December 2026
Supply contract
No
No
The present report aims to clarify the geometrical construction tolerances required in the
construction of the Precast Segmental Viaducts. It applies to all components that constitute the said
assets and should be implemented in design and construction.
The list of assets to which this document applies to is as follows:
- Water Orton 1 and 2 Viaducts
- River Tame West Single Track
- River Tame West Double Track Viaduct
- River Tame East Viaduct
Links
Follow the instructions given in the description or the more information section.
Bijalbes Desai
Water Orton Central, Watton Lane,
Water Orton
B461PA
UK
+447743984129
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Supply Distribution of Amb/Chill/Froz, Snacks Conf Soft Drinks and Fruit Veg (inc. Dairy) to Education Partnership North East下一篇:
SBRI Competition Fusion Industry Challenges - Novel Concepts for Robust Diagnostics Systems, Sensing and Control猜你喜欢