Published date: 16 December 2024
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
Construction work - 45000000
Site preparation work - 45100000
Works for complete or part construction and civil engineering work - 45200000
Engineering works and construction works - 45220000
Roof works and other special trade construction works - 45260000
Building installation work - 45300000
Building completion work - 45400000
Repair and maintenance services - 50000000
Repair and maintenance services of building installations - 50700000
Construction-related services - 71500000
CA28 7XY
CF-0201500D4L000000iAvzUAE
16 December 2024
10 January 2025
Works
No
No
This Prior Information Notice 6 (PIN 6), without call for competition, is to alert the market that Sellafield Ltd is continuing with market engagement activity for the forthcoming Project and Asset Care Execution (PACE) Contract Opportunity.
This PIN 6 supplements the previous:
• PIN 1 reference CF-0113800D4L000000iAvzUAE
• PIN 2 reference CF-0133500D4L000000iAvzUAE
• PIN 3 reference CF-0155800D4L000000iAvzUAE
• PIN 4 reference CF-0188400D4L000000iAvzUAE
• PIN 4A reference CF-0191900D4L000000iAvzUAE; and
• PIN 5 reference CF-0192900D4L000000iAvzUAE
As a result of this sixth PIN and as part of the ongoing market engagement activity, Sellafield Ltd is to provide information to the market in relation to the PACE opportunity, this includes the Functional Specification and Scope of Work; output from the Market Engagement Event held on 14th November 2024; and updates in relation to the incentivisation model / further areas of interest from PIN 5. These are set out in the supporting PACE PIN Market Engagement Information document shared via Atamis.
The majority of the work will take place in operational nuclear facilities and in radiologically controlled areas. The work involves maintaining existing asset condition and providing new asset capabilities when needed.
With the description provided as high-level examples only, the capabilities that will be required fit broadly into the following work disciplines and service types:
- Civil works, including roofing, painting, fencing, roads and paths etc.;
- Mechanical works, including heating and ventilation, pipework, steelwork etc.;
- Electrical works, including building lighting, alarm systems, instrumentation etc; and
- Project works, including Project, Contract & Cost Management etc.
The proposed strategy for the agreement duration is a 9+6 framework up to a maximum 15-year term.
The value of the work will be subject to ongoing governance and approval on an annual basis, but for planning purposes the mid-range estimate of the anticipated framework value across all the work package categories for the maximum duration of 15 years is £2,400,000,000 (£2,400m).
If you are not already registered on Atamis, you can access using the record reference C17465, by visiting the URL https://atamis-2464.my.site.com/s/Welcome for the PACE PIN 6 Market Engagement Information documents.
If you are interested in providing feedback, you should access Atamis using record reference C17465 and upload and return your completed RfI template by attaching it to a message using the 'New Messages' functionality. Completed RfIs should be returned at the earliest opportunity and preferably by 12:00 on Friday 10th January 2025.
Follow the instructions given in the description or the more information section.
Tony Davis
Hinton House, Birchwood
Warrington
WA3 6GR
GB
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Materials Recovery Facility (MRF) Processing and Haulage Procurement下一篇:
GB-Huddersfield: Civil Engineering Works at the University of Huddersfield猜你喜欢