信息详情

Minor Highway Repairs / Housing Footpath and Driveway Repairs Framework Agreement 2025 - 2027 (2029)

2025-02-10

中文

英语 (English)

所属地区: --

所属机构: --

抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 10 February 2025

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 25 March 2025, 5pm

Contract summary

Industry

  • Drainage and surface works - 45232451

  • Roadworks - 45233140

  • Road-maintenance works - 45233141

  • Show additional CPV codes for this notice
  • Road-repair works - 45233142

  • Various surface works - 45233200

  • Surface work for highways - 45233210

  • Surface work for roads - 45233220

  • Surface work for footpaths - 45233253

  • Location of contract

    North West

    Value of contract

    £0 to £2,000,000

    Procurement reference

    WIGN001-DN762165-84567856

    Published date

    10 February 2025

    Closing date

    25 March 2025

    Closing time

    5pm

    Contract start date

    1 June 2025

    Contract end date

    31 May 2027

    Contract type

    Works

    Procedure type

    Open procedure (below threshold)

    What is an open procedure (below threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements below the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    Wigan Council intends to procure a panel of providers to be part of a Framework Agreement for Minor Highway Repairs / Housing Footpath and Driveway Repairs.

    The Framework Agreement will consist of the following Lots:

    Lot 1 - Minor Highway Repairs
    Lot 2 - Housing Footpath and Driveway Repairs

    It is intended to appoint 3 providers per Lot (subject to there being sufficient tenderers who satisfy the criteria laid down within the tender process). Tenderers may bid for one or both Lots.

    The scope of works within this framework is Minor Highway Repairs / Housing Footpath and Driveway Repairs. This includes, but is not limited to, the following scope of works within each Lot:

    * Lot 1 - Minor Highway Repairs to footpaths and carriageways including relaying of kerbs, flags, block paving, concrete, edging kerbs, drainage channels and tactile paving.

    * Lot 2 - Housing Footpath and Driveway Repairs, this includes the flagging, tarmacking and concreting of perimeter footpaths and driveways. This Lot also includes the laying of ACO drainage systems and other small drainage repairs.

    The Framework Agreement will run for an initial period of 2 years and may be extended for two further periods of 12 months each.

    It is estimated that Wigan Council will place orders in the region of £400,000 per annum across both Lots (indicatively £200,000 per annum per Lot). These figures are for indicative purposes only and there is no guarantee of this, or any, quantity of work to be placed through the proposed Framework Agreement. The Framework Agreement will have a total maximum value of £2,000,000.

    Bidders are directed to view the Invitation to Tender documentation which contains the instructions for bidding and specification for this service.

    The deadline for the receipt of final tender submissions is Tuesday 25th March 2025 at 17:00.


    How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Address

    Town Hall
    Library Street
    Wigan
    WN1 1YN
    England

    Email

    W.Reid@wigan.gov.uk

    Website

    http://www.wigan.gov.uk/


    Share this notice

    Is there anything wrong with this page?

    温馨提示:

    本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
           如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    首页 > 英国 > Minor Highway Repairs / Housing Footpath and Driveway Repairs Framework Agreement 2025 - 2027 (2029)