Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 1 May 2025, 1pm

Contract summary

Industry

  • Installation services (except software) - 51000000

  • Environmental services - 90700000

  • Location of contract

    South East

    Value of contract

    £927,000

    Procurement reference

    RBWMEV2025

    Published date

    21 February 2025

    Closing date

    1 May 2025

    Closing time

    1pm

    Contract start date

    1 September 2025

    Contract end date

    31 August 2040

    Contract type

    Service contract

    Procedure type

    Open procedure (above threshold)

    What is an open procedure (above threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements above the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    RBWM has been awarded Local Electric Vehicle Infrastructure (LEVI) funding from the Department for Transport. The purpose of this funding is to support new concession contracts for on-street charging within RBWM. RBWM has decided to divide this funding into two equal amounts, each to support one of two new area-based concession contracts in the borough. These contracts will be awarded through a single procurement, each contract to be won by a different supplier.



    As concession contracts, the borough is looking to partner with chargepoint operators that will bring in significant private investment of their own throughout the life of the contract to provide charging solutions for residents across their concession area. Private investment should very substantially exceed the value of the grant funding. The Chargepoint Operator will be responsible for securing overall funding and financing for their capital investment and will need to provide suitable assurance within their bid of suitable funding and financing arrangements for the chargepoint sites that they commit to deliver.



    The purpose of the grant funding is to accelerate wider private investment in an on-street charging network - ensuring chargepoints are in place ahead of time ready to meet and further induce growing demand. The LEVI capital funding will contribute towards the cost of:

    Chargepoint hardware
    Chargepoint installation
    Upgraded or new grid connections, including the local connection from feeder pillar to charging assets
    Works to the highway to reconfigure existing or create new parking spaces and/or parking restrictions, including but not limited to signs and lining
    Introducing or amending Traffic Regulation Orders or parking restrictions
    Licenses, approvals, permits, and local authority planning fees relating to installation (where needed)


    More information

    Links

  • https://public.bravosolution.co.uk/
  • Bidding documents
  • Documents can be accessed here:

  • How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Lyn Hitchinson

    Address

    Town Hall
    MAIDENHEAD
    SL61RF
    England

    Telephone

    01628796285

    Email

    lyn.hitchinson@rbwm.gov.uk


    Share this notice

    Is there anything wrong with this page?

    温馨提示:

    本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
           如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    首页 > 英国 > Local Electric Vehicle Infrastructure On Street Electric Vehicle Charging Installations