Industry
Construction work - 45000000
Location of contract
United Kingdom
Value of contract
£2,900,000
Procurement reference
LANC001-DN763097-64917079
Published date
13 February 2025
Closing date
14 March 2025
Closing time
12pm
Contract start date
14 April 2025
Contract end date
15 February 2029
Contract type
Works
Procedure type
Open procedure (below threshold)
What is an open procedure (below threshold)?
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
This opportunity can be accesed from: https://procontract.due-north.com/Advert?advertId=e38bdeda-81e8-ef11-8134-005056b64545&fromProjectDashboard=True
The Council is seeking to appoint a supplier to design, procure and construct a circa 4MWp solar array with associated grid connection to the Electricity North-West Distribution Grid at the "Burrow Beck" site off Scotforth Road/Bailrigg Lane, Lancaster, LA1 4JL with grid reference: SD 47901 58388 and a solar rooftop installation of circa 782kWp at the "Gateway Building", Southgate, White Lund Industrial Estate, Lancaster, LA3 3PB with grid reference: SD 45111 62596. Together the "Project".
This scope of work is for the provision of Solar PV Equipment and Principal contractor and Principal Designer Services under the CDM Regulations for both projects. Note that at Burrow Beck the DNO connection (Contestable Works) and High Voltage works design, and delivery will be provided by a separate ICP Contractor.
The appointed supplier will be expected to design, procure and deliver the works at both the Burrow Beck and at the Gateway Building. The works are set out in the specification which can be found at Annex A.
Burrow Beck:
Burrow Beck achieved planning permission on 30 September 2024 under planning reference: 23/01383/FUL (https://www.lancaster.gov.uk/planning/view-applications-and-decisions)
A material planning amendment has been submitted due to the change in layout design. A decision is expected to be made on 7 April 2025.
Is in receipt of 4 connection offers which have been accepted and paid in full to Electricity North-West each for 990kW. Note that the connection works together with the provision of high voltage equipment, transformers and the main low voltage switchgear forms part of a separate scope of works (the "ICP Scope") and is not part of this tender;
Due to the long lead items, the ICP Works have already been tendered.
Tenderers will be permitted to tender for both procurements however no information will be provided relating to the procurement referred to at 2.6.2 for the ICP Works as part of this procurement process at this stage.
Burrow Beck will operate on a 100% sale to grid basis and opportunities to 'sleeve' energy to council buildings is also being explored.
Gateway Building
The installation is expected to be constructed under permitted development (PD) rights and the Contractor will ensure that the final design is compliant with any requirements associated with this. Due to Condition (2) Class J(c) of the Town and Country Planning Order 2015, the client has applied to see if "Prior Approval" is required. The outcome will be known by April 2025.
Is in receipt of an export connection agreement for 966kWAC from Electricity North-West which has been paid in full;