所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 23 October 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Roofing materials - 44112500
Waterproofing work - 45261420
Fireproofing work - 45343100
London
£5,000,000 to £10,000,000
C4N85234896
23 October 2024
5 November 2024
12pm
1 June 2025
30 June 2028
Works
No
No
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various roofing systems to satellite buildings around the station complex. Those buildings include the following:
• South Portal
• West Core
• East Core
• Train Crew and Catering Building
• North Portal
• Cycle Hub
• Interface sub station
• East Vent
The package includes Various roofing systems and build ups and will include a range of different specification and performance criteria such as:
- Polymer primers
- Liquid applied waterproofing (to meet required specification)
- Various Membrane types (to meet required specification)
- Water flow reduction layers (to meet required specification)
- Insulation (to meet required specification)
- Vapour control layers.
- Drainage outlets and assemblies with compatible leaf and gravel guards
- Inspection chambers
- Concrete paving slabs and pedestals
- Zinc double seam standing roof
- Aluminium Standing Seam Roofing
- Perimeter Gutters
- Pressed components/ accessories with a polyester powder coating finish
- Drainage edge channel with stainless steel grating
- Movement/expansion joints
- and all ancillary items where required. This includes detailing all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks.
Specifications and performance requirements included but not limited to
- Materials fire classification BROOF (t4) in accordance with BS EN 13501-5
- Acoustic BS EN ISO 354 ( as required by the acoustic consultants )
- BS EN 507 'Roofing products from metal sheet. Specification for fully supported roofing products of aluminium sheet
- Thermal Performance Requirements
- BS EN 14782 'Self-supporting metal sheet for roofing, external cladding and internal lining. Product specification and requirements
- BS 5427 'Code of practice for the use of profiled sheet for roof and wall cladding on buildings'.
- Drainage BS EN 12056: Part 3 and BS 8490
- Condensation with BS 5250, BS EN ISO 13788
The Subsubcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing, manufacture and installation of all roof systems
The Subsubcontractor will be responsible for progressing the roofing schedule and associated Stage 4 drawings through design for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.
Links
Follow the instructions given in the description or the more information section.
Clare Llewellyn
McDermott House, South Crescent
London
E164TL
UK
07933529243
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Aluminium Cladding C4 - KCSL下一篇:
Marché d'exploitation, de conduite et de maintenance des installations thermiques, de climatisation, de ventilation et de production d'eau chaude sanitaire de l'ensemble des Bâtiments communaux de la Ville de Veigné猜你喜欢