Published date: 23 October 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Aluminium - 14721000
Cladding - 44212381
Cladding works - 45262650
London
£5,000,000 to £10,000,000
C4N85874577
23 October 2024
5 November 2024
12pm
1 June 2025
30 June 2028
Works
No
No
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the supply and manufacture of bespoke architectural & Standing seam Aluminium, including associated rainwater systems to numerous satellite buildings around the station complex. Those buildings include the following:
• North Portal
• East core
• Cycle hub
• Train crew and catering building
• Number of smaller vent structures
The package includes a range of panel profiles, folded sections, interfaces and will include a range of different specification and performance criteria such as:
- Various panels with folded edges to form a 3-dimensional elevation.
- Bull nose cladding
- Soffit panels (with hinged details)
- Radius rainscreen panels
- Copings (including radius)
- Skirtings (stainless steel & Aluminium) with various finishes
- All the above in various lengths and shapes (circa 2m-9m and above)
- Various material thickness
- Anodising
- Polyester powder coated
- Welded stiffeners and joints
- Secondary support system
- Security specifications
- Fire specifications (meet the requirements of the Fire engineer's documentation as minimum)
- Acoustic & Thermal performance requirements
- Any other standards or specifications required by the employer
- Any ancillary items bracketry etc where required. This includes all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks.
The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for manufacture, supply and testing of the various cladding and rainscreen cladding panels and ancillary items.
The Subsubcontractor will be responsible for progressing the schedule and associated detailed drawings for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.
Quantity - circa 800m2 +
Expected Subsubcontract award Jan 25
Construction is to be carried out over a 2.5-year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.
Links
Follow the instructions given in the description or the more information section.
Clare Llewellyn
McDermott House, South Crescent
London
E164TL
UK
07933529243