Published date: 17 December 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Repair and maintenance work in connection with sports facilities - 45212290
Surface work for roads - 45233220
Surface work for footpaths - 45233253
EN2 9HG
£0
IT-442-76-LVRPA2024/24
17 December 2024
4 February 2025
12pm
10 March 2025
30 June 2031
Works
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey & Tennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded 'Gold Top' surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below.
This project is for the phased replacement of the Gold Top areas on a priority basis. It is envisaged that the Authority will split the 36,000m2 into approx. 4500m2/annum over an 8 phase period (one phase per financial year). The contractor will be required to remeasure areas on completion and works will be paid on a square metre basis.
The first phase of works will be scheduled to take place in March/April 2025 due to financial reasons but generally it is envisaged that the following phases will be carried out in May/June each year with the second phase being a 'follow on' to phase 1 in 2025.
The contractor should price for each phase separately and in doing so allow a nominal uplift for inflation and material price increases.
Links
Additional text
Is a Recurrent Procurement Type? : No
Follow the instructions given in the description or the more information section.
Alex Thompson
Bulls Cross
Enfield
Middlesex
EN2 9HG
United Kingdom
01992 709888
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Asset and Property Management Consultancy Framework下一篇:
จ้างเหมาบริการ เตรียมอาหารเลี้ยงเชื้อ เพิ่มจำนวนเชื้อสาเหตุโรคพืช และเตรียมเมล็ดพันธุ์ข้าวโพด โดยวิธีเฉพาะเจาะจง猜你喜欢